Basic Search / Search Result

  • Search Result: 90results Search Strategy: "楊亦東".cadvisor (Phrase)


  • Refine the results: Search Expand the trend chart of search results

  • Individualized services

    My Search Strategy

  • Sort:

      
  • Selected0results


      Select all on this page

    1

    Two-level Optimization Model for Earthmoving Operation
    • Department of Civil and Construction Engineering /110/ Master
    • Author: Catherine MIchellie Widjaja Advisor:
    • A land-leveling phase before starting the further construction activity due to the uneven land surf…
    • Clicks: 297Downloads: 0
    • Full text public date 2024/08/08 (Intranet public)
    • Full text public date 2024/08/08 (Internet public)
    • Full text public date 2024/08/08 (National library)

    2

    Practice of Value Engineering Mechanism–Example of Zuoying Harbor the combination of Trestle Bridge and Piled dock C3

    3

    Durability Diagnosis and Maintenance Management System for Reinforced Concrete Buildings Using Building Information Modeling

    4

    Decision supporting model for pavement maintenance scheduling

    5

    BIM-based Construction Production History System for Reinforced Concrete Structures

    6

    Research on the development decision-making of green building construction cases -Take urban renewal collective housing as an example
    • Department of Civil and Construction Engineering /109/ Master
    • Author: Li-Chien Lin Advisor:
    • In recent years, due to changes in the environment, government laws and the needs of the constructi…
    • Clicks: 467Downloads: 0
    • Full text public date 2024/08/05 (Intranet public)
    • Full text public date 2026/08/05 (Internet public)
    • Full text public date 2026/08/05 (National library)

    7

    Research on Termination of Contract and Recontract-Take the mechanical and electrical engineering of a new building as an example
    • Department of Civil and Construction Engineering /109/ Master
    • Author: Ming-Yuan Chu Advisor:
    • During the execution of a public works project, the contractor is often unable to continue to perfo…
    • Clicks: 414Downloads: 3
    • Full text public date 2023/01/19 (Intranet public)
    • Full text public date 2026/01/19 (Internet public)
    • Full text public date 2026/01/19 (National library)

    8

    A Study of Adaptive Reuse Vacant Space as Childcare Facilities

    9

    Graphical scheduling algorithm for construction projects

    10

    The Real Estate Valuation Model of Apartment Buildings in the Eastern and Western Parts of Taipei City