研究生: |
林子傑 Tzu-Chieh Lin |
---|---|
論文名稱: |
智慧轉型之成熟度評估模型研究: 以專案管理觀點之探討 The maturity assessment model for smart transformation: project management perspective |
指導教授: |
王孔政
Kung-Jeng Wang 盛麗慧 Li-Huei Sheng |
口試委員: |
蔣明晃
羅明琇 黃忠偉 Jong-Woei Whang 曹譽鐘 Yu-Chung Tsao 盛麗慧 Li-Huei Sheng 王孔政 Kung-Jeng Wang |
學位類別: |
博士 Doctor |
系所名稱: |
管理學院 - 管理研究所 Graduate Institute of Management |
論文出版年: | 2021 |
畢業學年度: | 110 |
語文別: | 中文 |
論文頁數: | 106 |
中文關鍵詞: | 成熟度模型 、專案管理 、智慧製造 、智慧轉型 、工業4.0 |
外文關鍵詞: | maturity assessment model, project management, smart manufacturing, smart transformation, Industry 4.0 |
相關次數: | 點閱:696 下載:0 |
分享至: |
查詢本校圖書館目錄 查詢臺灣博碩士論文知識加值系統 勘誤回報 |
一. 英文文獻
1. Akdil K.Y., Ustundag A., & Cevikcan E. (2018). Maturity and Readiness Model for Industry 4.0 Strategy. In: Industry 4.0: Managing The Digital Transformation. Springer Series in Advanced Manufacturing. Springer, Cham. https://doi.org/10.1007/978-3-319-57870-5_4.
2. Aspara, J., Hietanen, J., & Tikkanen, H. (2010). Business model innovation vs replication: financial performance implications of strategic emphases. Journal of Strategic Marketing, 18(1), 39–56.
3. Backlund. F., Chroneer, D., & Sundqvist, E. (2014). Project management maturity models A critical preview: a case study within Swedish engineering and construction organizations. Procedia-Social and Behavioral Science, 119, 837-846. https://doi.org/10.1016/j.sbspro.2014.03.094.
4. Badiru, A.B. (1996). Project management in manufacturing and high technology operation. Second edition. John Wiley & Sons, Inc. New York, USA.
5. Basl, J. (2018). Analysis of Industry 4.0 Readiness Indexes and Maturity Models and Proposal of the Dimension for Enterprise Information Systems. Research and Practical Issues of Enterprise Information Systems, 57–68. https://doi.org/10.1007/ 978-3-319-99040-8_5.
6. Bharadwaj, A.S., El Sawy, O., Pavlou, P.A., & Venkatraman, (2013). NV. Digital Business Strategy: Toward a Next Generation of Insights. MIS Quarterly, 37 (2): 471-482.
7. Blatz, F., Bulander, R., & Dietel, M. (2018). Maturity model of digitalization for SMEs. 2018 IEEE International Conference on Engineering, Technology and Innovation (ICE/ITMC).
8. Bohlmann, J. D., Spanjol. J., Qualls, W. J., & Rosa, J. A. (2013). The Interplay of Customer and Product Innovation Dynamics: An Exploratory Study. Journal of Product Innovation Management, 30 (2), 228–244.
9. Bryde, D.J. (1997). Underpinning modern project management with TQM principles. The TQM Magazine, 9 (3), 231–238.
10. Cakmakci, M. (2019). Interaction in Project Management Approach Within Industry 4.0. In: Trojanowska J., Ciszak O., Machado J., Pavlenko I. (eds) Advances in Manufacturing II. MANUFACTURING 2019. Lecture Notes in Mechanical Engineering. Springer, Cham. https://doi.org/10.1007/978-3-030-18715-6_15
11. Cameron, R., Sankaran, S., & Scales, J. (2015). Mixed Methods Use in Project Management Research. Project Management Journal, 46(2), 90–104. doi:10.1002/pmj.21484
12. Canetta, L., Barni, A., & Montini, E. (2018). Development of a Digitalization Maturity Model for the Manufacturing Sector. In 2018 IEEE International Conference on Engineering, Technology and Innovation (ICE/ITMC), 1–7. Stuttgart, Germany: IEEE. https://doi.org/10.1109/ICE.2018.8436292.
13. Carolis, A., Marcchi, M., Negri, E., & Terzi, S. A. (2017). Maturity Model for Assessing the Digital Readiness of Manufacturing Companies. IFIP International Federation for Information Processing, 2017;13–20.
14. Chien, C.C., Hong, T.Y., & Guo, H.Z. 2017. “A Conceptual Framework for Industry “3.5” to Empower Intelligent Manufacturing and Caser studies”, Procedia Manufacturing, 11: 2009-2017.
15. Creswell, JW., & Plano Clark, V. L. (2007). Designing and Conducting Mixed Methods Research. Thousand Oaks, CA: Sage Publications.
16. Creswell, W., & Plano Clark, V. L. (2011). Designing and conducting mixed methodsresearch (2nd edn). Thousand Oaks: Sage Publications.
17. Christenson, D., & Walker, H.T. (2004). Understanding the role of “Vision” in project success. Project management Journal, 35(3): 39-52.
18. Cronbach, L. (1951). Coefficient Alpha and the Internal Structure of Tests. Psychomerika, 16: 297–334.
19. Deloitte. (2020). Taiwan intelligent manufacturing key capability survey, artificial intelligence manufacturing system R & D center. https://www2.deloitte.com/content/dam/Deloitte/tw/Documents/energy-resources/rp201201-tw-intelligent-manufacturing-survey-pdf.pdf
20. Deloitte. (2017). Tech Trend Report. https://www.bond.org.uk/sites/default/files/resource-documents/fti_tech_trend_report_2017.pdf
21. Deros, B. M., Yusof, S.M. & Salleh, A.M. (2006). A Benchmarking implementation framework for automotive manufacturing SMEs, Benchmarking: An International Journal, 13(4): 396-430.
22. Dreyer, S, Egger, A., Püschel, L., & Röglinger, M. (2020). Prioritising smart factory
investments – A project portfolio selection approach, International Journal of
Production Research, https://doi.org/10.1080/00207543.2020.1849845.
23. Ehrhardt, K., Miller, S.J., Freeman, S., & Hom, P.W. (2014). Examining project commitment in cross-functional team: antecedents and relationship with team performance, Journal of Business and Psychology. 29: 443-461.
24. European Commission (EC). (2014). Digital transformation. https://www.europarl.europa.eu/RegData/etudes/BRIE/2019/633171/EPRS_BRI(2019)633171_EN.pdf.
25. Eurostat. (2008). Glossary: High-tech classification of manufacturing industries (NACE Revision 2). from https://ec.europa.eu/eurostat/statistics-explained/index.php?title=Glossary:Statistical_classification_of_economic_activities_in_the_European_Community_(NACE).
26. Frame, D. (1995). Managing projects in organization: how to make the best use of time, techniques and people. Second edition. John Wiley & Sons Inc. New York, USA.
27. Ganzarain, J., & Errasti, N. (2016). Three stage maturity model in SME’s toward industry 4.0. Journal of Industrial Engineering and Management. 9(5): 1119.
28. Gido, J., & Clements JP. (2011). Successful project management, 5ed. South-Western College Publishing. Ohio, USA.
29. Griffin, A., Price, R. L., Maloney, M. M., Vojak, B. A., & Sim, E. W. (2009). Voices from the Field: How Exceptional Electronic Industrial Innovators Innovate. Journal of Product Innovation Management. 26 (2), 222–240
30. Gruman, G. (2016). What Digital Transformation Really Means. InfoWorld. Available from http://www.infoworld. com/article/3080644/it-management/what-digital-transformation-really-means.html.
31. Harrison, R. L. (2013). Using mixed methods designs in the Journal of Business Research, 1990–2010. Journal of Business Research, 66(11), 2153–2162. https://doi.org/10.1016/j.jbusres.2012.01.006
32. International Project Management Association (IPMA) (2021). https://www.ipma.world/about-us/
33. Jallya, V., Kulkarnib, V.N., Gaitondec, V.N., Satisd, G.J., & Kotturshettare, B.B. (2020). A review on project management transformation using industry 4.0. 2nd International Conference on Manufacturing, Material Science and Engineering 2020AIP Conf. Proc. 2358, 100014-1–100014-6; https://doi.org/10.1063/5.0057988 Published by AIP Publishing. 978-0-7354-4114-9/$30.00
34. Jugdev, K., & Thomas, J. (2002). Project management maturity models: the silver bullets of competitive advantage? Project Management Journal, 33(4), 4-14.
35. Kagermann, H., Wahlster, G., & Helbig, J. (2013). Recommendations for implementing the strategic initiative INDUSTRIE 4.0.” Berlin: Industrie 4.0 Working Group of Acatech. https://www.din.de/blob/76902/e8cac883f42bf28536e7e8165993f1fd/recommendations-for-implementing-industry-4-0-data.pdf.
36. Kang, H.S., Lee, J.Y., Choi, S.S., Kim, H., Park, J.H., Son, J.Y., Kim, B.H., & Noh, S.D. (2016). Smart Manufacturing: Past Research, Present Findings, and Future Directions. International Journal of Precision Engineering and Manufacturing-Green Technology.3 (1):111–128.
37. Kaiser, H.F. (1974). An index of factorical simplicity. Psychometrica, 39,31-36.
38. Kerzner, H. (2017). Project management: a systems approach to planning,
scheduling and controlling. 12th edition, John Wiley & Son, Inc Hoboken, New
Jersey, USA.
39. Lasi, H., Fettke, P., Kemper, H.G., Feld, T., & Hoffman, M. (2014). Industry 4.0. Bus Inf Syst Eng, 6(4) :239–242.
40. Laurence, Morissette., & Sylvain, Chartier. (2013). The k-means clustering technique: General considerations and implementation in Mathematica. Tutorials in Quantitative Methods for Psychology, 9(1), 15-24. https://www.researchgate.net/publication/308020680_The_k-means_clustering_technique_General_considerations_and_implementation_in_Mathematica
41. Lewis, J. P. (2007). Fundanmentals of project management. Third version. American Management Association.
42. Liao, Y., Deschamps, F., Loures, E.F.R., & Ramos, L.F.P. (2017). Past, present and future of industry 4.0-a systematic literature review and research agenda proposal. Int J Prod Res. 55(12): 3609–3629.
43. Lichtblau, K., Stich, V., Bertenrath, R., Blum, M., Bleider, M., Millack, A., Schmitt, K., Schmitz, E., & Schröter, M. (2015). Industrie 4.0 Readiness. IMPULS-Stiftung for mechanical engineering, plant engineering, and information technology. 2015. http://www.impuls-stiftung.de/ documents/3581372/4875835/Industrie+4.0+Readniness+ IMPULS+Studie+Oktober+2015.pdf/447a6187-9759-4f25-b186- b0f5eac69974.
44. Lin, T.C., Wang, K.J., & Sheng, M.L. (2020). To assess smart manufacturing readiness by maturity model: A case study on Taiwan enterprises. International Journal of Computer Integrated Manufacturing. 33 (1): 102–115. https://doi.org/10.1080/0951192X.2019.1699255.
45. Lin, T.C. & Wang, K.J. (2021). Project-based maturity assessment model for smart transformation in Taiwanese enterprises. PLoS ONE 16(7), e0254522. https://doi.org/10.1371/journal.pone.0254522
46. López-Robles, J.R., Otegi-Olaso, J.R., Cobo, M.J., Bertolin-Furstenau, L., Kremer-Sott, M., López-Robles, L.D., & Gamboa-Rosales, N.K. (2020). The relationship between Project Management and Industry 4.0: Bibliometric analysis of main research areas through Scopus., In 3rd International Conference on Research and Education in Project Management – REPM 2020, Bilbao, Spain, 20-21 February 2020.
47. MarketsandMarkets. (2020a) Market Study: by Enabling Technology (Condition Monitoring, Artificial Intelligence, IIoT, Digital Twin, Industrial 3D Printing), Information Technology (WMS, MES, PAM, HMI), Industry, and Region - Global Forecast to 2025. https://www.marketsandmarkets.com/Market-Reports/smart-manufacturing-market-105448439.html?gclid=Cj0KCQjwraqHBhDsARIsAKuGZeFL0URqDo9zUPs8dpLZZF8kDch80NXwb7ESpY8bm27m-IVa8bkdgegaAi3iEALw_wcB.
48. MarketsandMarkets. (2020b). Digital Transformation Market by Technology (Cloud Computing, Big Data and Analytics, Mobility/Social Media, Cybersecurity, Artificial Intelligence), Deployment Type, Vertical (BFSI, Retail, Education), and Region - Global Forecast to 2025. https://www.marketsandmarkets.com/Market-Reports/digital-transformation-market-43010479.html.
49. Miles, M. B., & Huberman, A. M. (1994). Qualitative Data Analysis. 2nd ed. Thousand Oaks, CA: Sage Publications.
50. Mir, F.A., & Pinnington, A.H. (2014). Exploring the value of project management: linking project management performance and project success. International journal of Project Management, 32. 202-217.
51. Mittal, S., Khan, M.A., Romero, D., & Wuest, T. (2018). A critical review of smart manufacturing & Industry 4.0 maturity momidels: Implications for small and medium-sized enterprises (SMEs). Journal of Manufacturing Systems. 49: 194-214. https://doi.org/10.1016/j.jmsy.2018.10.005.
52. MPI Group (MPIG). (2018). The digital road to Industry 4.0 and Beyond. https://www.sap.com/documents/2018/10/ec60ab4b-207d-0010-87a3-c30de2ffd8ff.html.
53. Nikkhou, S., Taghizadeh, K., & Hajiyakhchali, S. (2016). Designing a Portfolio Management Maturity Model (Elena). Procedia-Social and Behavioral Science. 226: 318–32
54. Nunnally, J. (1978). Psychometric theory. New York: McGraw-Hill.
55. Pennypacker, J. S., & Grant, K. P. (2002). Project management maturity: an industry-wide assessment. Paper presented at PMI® Research Conference 2002: Frontiers of Project Management Research and Applications, Seattle, Washington. Newtown Square, PA: Project Management Institute.
56. PMBOK® Guide. (2021). A Guide to the Project Management Body of Knowledge. Project management institute. https://www.pmi.org/pmbok-guide-standards/foundational/pmbok
57. Prahalad, C.K., & Oosterveld, J.P. (1990). Transforming Internal Governance: The Challenge for Multinationals. Sloan Management Review. 40 (3) :31–40.
58. PwC. (2016). Industry 4.0: Building the Digital Enterprise. https://www.PwC.com/gx/en/industries/industries-4.0/landing-page/industry-4.0-building-your-digital-enterprise-april-2016.pdf.
59. PwC. 2020. COVID-19: A digital technology agenda driving an accelerated transition to the new normal. https://www.pwc.de/de/deals/covid-19-a-digital-technology-agenda-driving-an-accelerated-transition-to-the-new-normal.pdf
60. Rafael, L.D., Jaione, G.E., Cristina, L., & Ibon, S.L. (2020). An Industry 4.0 maturity model for machine tool companies. Technological Forecasting and Social Change. 159(c). https://doi.org/10.1016/j.techfore.2020.120203.
61. Rockwell Automation. (2014). The Connected Enterprise Maturity Model. https://literature.rockwellautomation.com/idc/groups/literature/documents/wp/cie-wp002_-en-p.pdf.
62. Rockwell Automation. (2017). Annual Investor Conference. https://literature.rockwellautomation.com/idc/groups/literature/documents/wp/cie-wp002_-en-p.pdf.
63. Santos, R.C., & Martinho, J.L. (2019). An Industry 4.0 maturity model proposal. Journal of Manufacturing Technology Management. 31 (5):1023-1043. https://doi.org/ 10.1108/jmtm-09-2018-0284.
64. Schumacher, A., Erol, S., & Sihn, W. (2016). A Maturity Model for Assessing Industry 4.0 Readiness and Maturity of Manufacturing Enterprises. Procedia CIRP. 52 :161–166. https://doi.org/10.1016/j.procir.2016.07.040.
65. Shrestha, S., & Kazama, F. (2007). Assessment of Surface Water Quality Using Multivariate Statistical Techniques: A Case Study of the Fuji River Basin, Japan. Environmental Modelling and Software, 22 (4): 464–4
66. Singapore Economic Development Board (EDB). (2017). Singapore Smart Industry Readiness Index: Catalyzing the Transformation of Manufacturing. 1-46. https://www.edb.gov.sg/en/news-and-resources/news/advanced-manufacturing-release.htsml.
67. Tashakkori, A., & Teddlie, C. (2003). Handbook of Mixed Methods in Social and Behavioral Research. Thousand Oaks: Sage.
68. Tavakol, M., & Dennick, R. (2011). Making Sense of Cronbach’s Alpha. International Journal of Medical Education. 2 :53–55. https://doi.org/ 10.5116/ijme.4dfb.8dfd.
69. Terrazas., G., Ferry, N., & Ratchev, S. (2019). A cloud-based framework for shop floor big data management and elastic computing analytics. Computers in Industry. 109: 204-214.
70. Wagire, A.A., Joshi, R., Rathore, A.P.S., & Jain, R. (2020). Development of maturity model for assessing the implementation of Industry 4.0: learning from theory and practice. Production Planning & Control, 1–20. https://doi.org/10.1080/09537287.2020.1744763.
71. Win T. Z, & Kham S.M. (2018). Transformation of Project Management in Industry 4.0. Proceedings of the 12th International Conference on Project Management (ProMAC2018). The Society of Project Management. Bangkok, Thailand. 2018. 36–44.
72. Win, T. Z., & Kham, S.M. (2020). Exploring Industry 4.0 Paradigm as Applied to Project Management: A Proof of Concept. Management Studies, Sep.-Oct. 2020, Vol. 8, No. 5, 341-357. https://doi.org/ 10.17265/2328-2185/2020.05.001
二. 中文文獻
1. 王保進(2000),描述統計Descriptive Statistics,教育大辭書,國家教育研究院。
https://terms.naer.edu.tw/detail/1311172/。
2. 王保進(2002),視窗版SPSS與行為科學研究,台北,心理。
3. 王文科、王智弘(2004),教育研究法,台北市,五南圖書。
4. 王岫晨(2021-08-13),工業4.0對症下藥加速實現工廠自動化數位轉型,CTIMES。
http://smartauto.ctimes.com.tw/DispArt-tw.asp?O=210813110897
5. 吳升皓(2009),全球專案管理 3 體系:PMI、IPMA、PRINCE2,經理人,58:114-115。
6. 吳統雄(1985),態度與行為研究的信度與效度-理論、反應、反省.民意學術專刊,夏季號,47-66。
7. 宋曜廷、潘佩妤(2010),混合研究在教育研究的應用,教育科學研究期刊,55(4),97‒130。
8. 張紹勳(2001),研究方法(修訂版),滄海書局,臺中市,256-258。
9. 高義展(2010),專案管理指標建構之研究,專案管理電子期刊第三十八期2010年01月。
10. Niven, P. R., & Lamorte, B. (2019),執行OKR帶出強團隊(姚怡平譯),台北,采實文化。(原著出版於 2016)。
11. PMI 國際專案管理學會台灣分會譯(2013),PMI 國際專案管理學會,專案管理知識體系指南,第五版,臺北,博旭科技顧問股份有限公司。
12. 陳鐵元(2016),從智慧製造趨勢看台灣產業的機會與挑戰,工業技術研究院IEK簡報,產業發展趨勢研討會。
13. 陳昇瑋,溫怡玲(2019-07-12),人工智慧在台灣,天下雜誌出版。
14. SEMI Taiwan(2019),物聯網,工業4.0的轉型關鍵!。
15. 黃燕娣(2016),高二低成就學生學習適應之混合方法研究----以馬來西亞巴生興華中學為例,國立彰化師範大學教育研究所碩士論文,彰化縣。
16. 熊培霖、范淼、黃哲銘、周祥東、陸正平(2006),專案管理基礎知識與應用實務:專案管理入門寶典,臺北,博鴻國際。
17. 詹碧綢(2003),影響專案成功關鍵因素的研究,以網路通訊設備服務業例,品質月刊,34-38。
18. 經濟部工業局(2021),AI加值智慧製造產業推廣計畫。
https://www.moeaidb.gov.tw/ctlr?PRO=project.rwdProjectView&id=2654
19. 涂翠珊(2021-09-30),英Made Smarter計畫協助製造商引進自動化技術,DIGITIMES。https://www.digitimes.com.tw/iot/article.asp?cat=158&cat2=10&ct=o&id=0000619963_1U0L4LPY5WR1RE4WZ0MKB