研究生: |
Helmy Andamari Kwintanada Helmy Andamari Kwintanada |
---|---|
論文名稱: |
考量高頻率故障下之產線排程及維護最佳化問題 Integrated Production and Maintenance Scheduling Optimization for Frequent Machine Breakdown Consideration |
指導教授: |
楊朝龍
Chao-Lung Yang |
口試委員: |
林希偉
Shi-Woei Lin 王孔政 Kung-Jeng Wang |
學位類別: |
碩士 Master |
系所名稱: |
管理學院 - 工業管理系 Department of Industrial Management |
論文出版年: | 2022 |
畢業學年度: | 110 |
語文別: | 英文 |
論文頁數: | 94 |
中文關鍵詞: | 更正性維護 、預防性維護 、混合整數非線性規劃 、與順序相關之生產配置 、最大概似估計 |
外文關鍵詞: | Mathematical Modelling, Sequence-Dependent Setup |
相關次數: | 點閱:314 下載:0 |
分享至: |
查詢本校圖書館目錄 查詢臺灣博碩士論文知識加值系統 勘誤回報 |
Angius, A., Colledani, M., Silipo, L., & Yemane, A. (2016). Impact of Preventive Maintenance on the Service Level of Multi-stage Manufacturing Systems with Degrading Machines. IFAC-PapersOnLine, 49(12), 568–573. https://doi.org/10.1016/j.ifacol.2016.07.696
Boudjelida, A. (2019). On the robustness of joint production and maintenance scheduling in presence of uncertainties. Journal of Intelligent Manufacturing, 30(4), 1515–1530. https://doi.org/10.1007/s10845-017-1303-9
Curcio, E., Amorim, P., Zhang, Q., & Almada-Lobo, B. (2018). Adaptation and approximate strategies for solving the lot-sizing and scheduling problem under multistage demand uncertainty. International Journal of Production Economics, 202(February 2017), 81–96. https://doi.org/10.1016/j.ijpe.2018.04.012
Daniewski, K., Kosicka, E., & Mazurkiewicz, D. (2018). Analysis of the correctness of determination of the effectiveness of maintenance service actions. Management and Production Engineering Review, 9(2), 20–25. https://doi.org/10.24425/119522
Ettaye, G., El Barkany, A., & El Khalfi, A. (2016). The integration of maintenance plans and production scheduling for a degradable multi-state system: A literature review. International Journal of Productivity and Quality Management, 19(1), 74–97. https://doi.org/10.1504/IJPQM.2016.078017
Gholami-Zanjani, S. M., Hakimifar, M., Nazemi, N., & Jolai, F. (2017). Robust and Fuzzy Optimisation Models for a Flow shop Scheduling Problem with Sequence Dependent Setup Times: A real case study on a PCB assembly company. International Journal of Computer Integrated Manufacturing, 30(6), 552–563. https://doi.org/10.1080/0951192X.2016.1187293
Gholamian, N., Mahdavi, I., & Tavakkoli-Moghaddam, R. (2016). Multi-objective multi-product multi-site aggregate production planning in a supply chain under uncertainty: Fuzzy multi-objective optimisation. International Journal of Computer Integrated Manufacturing, 29(2), 149–165. https://doi.org/10.1080/0951192X.2014.1002811
Göttlich, S., & Knapp, S. (2020). Uncertainty quantification with risk measures in production planning. Journal of Mathematics in Industry, 10(1). https://doi.org/10.1186/s13362-020-00074-4
Guimarães, L., Klabjan, D., & Almada-Lobo, B. (2014). Modeling lotsizing and scheduling problems with sequence dependent setups. European Journal of Operational Research, 239(3), 644–662. https://doi.org/10.1016/j.ejor.2014.05.018
Han, J., Liu, Y., Luo, L., & Mao, M. (2020). Knowledge-Based Systems Integrated production planning and scheduling under uncertainty : A fuzzy bi-level decision-making approach. Knowledge-Based Systems, 201–202, 106056. https://doi.org/10.1016/j.knosys.2020.106056
Hu, H., Ng, K. K. H., & Qin, Y. (2016). Robust Parallel Machine Scheduling Problem with Uncertainties and Sequence-Dependent Setup Time. Scientific Programming, 2016. https://doi.org/10.1155/2016/5127253
Lakshamana, T., and Nikolovski, S., 2006, Reliability evaluation of composite system, Rajsons publication PVT. LTD., New Delhi.
Liu, X., WANG, W., & PENG, R. (2015). An integrated production and delay-time based preventive maintenance planning model for a multi-product production system. Eksploatacja i Niezawodnosc - Maintenance and Reliability, 17(2), 215–221. https://doi.org/10.17531/ein.2015.2.7
Liu, Y. F., & Zhang, Q. S. (2018). Multi-objective production planning model for equipment manufacturing enterprises with multiple uncertainties in demand. Advances in Production Engineering And Management, 13(4), 429–441. https://doi.org/10.14743/apem2018.4.301
Lu, Z., Cui, W., & Han, X. (2015). Computers & Industrial Engineering Integrated production and preventive maintenance scheduling for a single machine with failure uncertainty q. Computers & Industrial Engineering, 80, 236–244. https://doi.org/10.1016/j.cie.2014.12.017
Manzini, M., & Urgo, M. (2015). Makespan estimation of a production process affected by uncertainty: Application on MTO production of NC machine tools. Journal of Manufacturing Systems, 37, 1–16. https://doi.org/10.1016/j.jmsy.2015.10.001
Masruroh, N. A., Fauziah, H. A., & Sulistyo, S. R. (2020a). Integrated production scheduling and distribution allocation for multi-products considering sequence-dependent setups: a practical application. Production Engineering, 0123456789. https://doi.org/10.1007/s11740-020-00954-z
Moghaddam, K. S., & Usher, J. S. (2011). Preventive maintenance and replacement scheduling for repairable and maintainable systems using dynamic programming. Computers and Industrial Engineering, 60(4), 654–665. https://doi.org/10.1016/j.cie.2010.12.021
Naboureh, K., & Safari, E. (2016). Integrating the sequence dependent setup time open shop problem and preventive maintenance policies. Decision Science Letters, 5(4), 535–550. https://doi.org/10.5267/j.dsl.2016.4.002
Naderi, B., Zandieh, M., & Fatemi Ghomi, S. M. T. (2009). Scheduling sequence-dependent setup time job shops with preventive maintenance. International Journal of Advanced Manufacturing Technology, 43(1–2), 170–181. https://doi.org/10.1007/s00170-008-1693-0
Noshadravan, A., Gaustad, G., Kirchain, R., & Olivetti, E. (2017). Operational Strategies for Increasing Secondary Materials in Metals Production Under Uncertainty. Journal of Sustainable Metallurgy, 3(2), 350–361. https://doi.org/10.1007/s40831-016-0100-6
Nourali, S., Imanipour, N., & Shahriari, M. R. (2012). A mathematical model for integrated process planning and scheduling in flexible assembly job shop environment with sequence dependent setup times. International Journal of Mathematical Analysis, 6(41–44), 2117–2132.
Pariazar, M., & Sir, M. Y. (2018). A multi-objective approach for supply chain design considering disruptions impacting supply availability and quality. Computers and Industrial Engineering, 121(February 2017), 113–130. https://doi.org/10.1016/j.cie.2018.05.026
Pascale, E., Freneaux, T., Sista, R., Sannino, P., Marmo, P., & Bouillaut, L. (2017). Application of the Weibull distribution for the optimization of maintenance policies of an electronic railway signaling system. Safety and Reliability - Theory and Applications - Proceedings of the 27th European Safety and Reliability Conference, ESREL 2017, 3409–3416. https://doi.org/10.1201/9781315210469-429
Puchkova, A., McFarlane, D., Srinivasan, R., & Thorne, A. (2020). Resilient planning strategies to support disruption-tolerant production operations. International Journal of Production Economics, November 2019, 107614. https://doi.org/10.1016/j.ijpe.2020.107614
Purohit, B. S., & Lad, B. K. (2016). Production and maintenance planning : an integrated approach under uncertainties. The International Journal of Advanced Manufacturing Technology, 3179–3191. https://doi.org/10.1007/s00170-016-8415-9
Rabieh, M., Modarres, M., & Azar, A. (2018). Robust-fuzzy model for supplier selection under uncertainty: An application to the automobile industry. Scientia Iranica, 25(4), 2297–2311. https://doi.org/10.24200/sci.2017.4456
Saif, Y., Rizwan, M., Almansoori, A., & Elkamel, A. (2019). Municipality solid waste supply chain optimization to power production under uncertainty. Computers and Chemical Engineering, 121, 338–353. https://doi.org/10.1016/j.compchemeng.2018.11.003
Sakalli, U. S. (2017). Optimization of Production-Distribution Problem in Supply Chain Management under Stochastic and Fuzzy Uncertainties. Mathematical Problems in Engineering, 2017. https://doi.org/10.1155/2017/4389064
Sgarbossa, F., Zennaro, I., Florian, E., & Persona, A. (2018). Impacts of weibull parameters estimation on preventive maintenance cost. IFAC-PapersOnLine, 51(11), 508–513. https://doi.org/10.1016/j.ifacol.2018.08.369
Shen, L., Dauzère-Pérès, S., & Neufeld, J. S. (2018). Solving the flexible job shop scheduling problem with sequence-dependent setup times. European Journal of Operational Research, 265(2), 503–516. https://doi.org/10.1016/j.ejor.2017.08.021
Shen, X. N., Han, Y., & Fu, J. Z. (2017). Robustness measures and robust scheduling for multi-objective stochastic flexible job shop scheduling problems. Soft Computing, 21(21), 6531–6554. https://doi.org/10.1007/s00500-016-2245-4
Siswanto, A., & Kurniati, N. (2018). Determining optimal preventive maintenance interval for component of Well Barrier Element in an Oil & Gas Company. IOP Conference Series: Materials Science and Engineering, 337(1). https://doi.org/10.1088/1757-899X/337/1/012066
Solari, H. S., Majidi, B., & Moazzami, M. (2019). Optimal estimation of weibull distribution parameters in order to provide preventive-corrective maintenance program for power transformers. Iranian Journal of Electrical and Electronic Engineering, 15(4), 536–544. https://doi.org/10.22068/IJEEE.15.4.536
Talay, I., & Özdemir-Akyıldırım, Ö. (2019). Optimal procurement and production planning for multi-product multi-stage production under yield uncertainty. European Journal of Operational Research, 275(2), 536–551. https://doi.org/10.1016/j.ejor.2018.11.069
Yang, F., Ren, H., & Hu, Z. (2019). Maximum likelihood estimation for three-parameter weibull distribution using evolutionary strategy. Mathematical Problems in Engineering, 2019. https://doi.org/10.1155/2019/6281781