研究生: |
蘇亮綱 Liang-kang Su |
---|---|
論文名稱: |
利用TEST SPC提升測試設備綜合效率及使用率(OEE)/(OEU) A Study of Applying Test SPC to Promote Test Operation OEE and OEU |
指導教授: |
徐世輝
Shey-Huei Sheu |
口試委員: |
許總欣
Tsung-shin Hsu 陳坤盛 Kuen-sheng chen |
學位類別: |
碩士 Master |
系所名稱: |
管理學院 - 工業管理系 Department of Industrial Management |
論文出版年: | 2005 |
畢業學年度: | 93 |
語文別: | 中文 |
論文頁數: | 75 |
中文關鍵詞: | 隨批抽測(L/A) 、統計製程品管(SPC) 、設備綜合效率 (OEE) 、設備綜合使用率(OEU) 、出貨量(NUB) |
外文關鍵詞: | L/A(Lot Accetance), Overall Equipment Efficiency (OEE), NUB (Net Unit Built), Overall Equipment Utilization(OEU), SPC (Statistic Process Control) |
相關次數: | 點閱:586 下載:9 |
分享至: |
查詢本校圖書館目錄 查詢臺灣博碩士論文知識加值系統 勘誤回報 |
本研究主要係針對具有因龐大的設備投資導致成本過高的半導體測試產業為研究對象,結合製程統計品管(SPC,Statistic Process Control)的觀念與作法來追求生產設備綜合效率的最佳化,進而在營運成本,產品測試品質上臻於完美的境界。
本研究所考慮的參數有:設備綜合效率(OEE),(OEU),隨批品保抽測的百分比 (L/A %),出貨量(NUB,Net Unit Built),客戶風險指標 (DPPM,Defect Per Million of units)。其基本的作法是以有效地管理測前生產作業上的所有變異數,如操作人員紀律的要求,硬體設備重要參數的衡量管理,測式程式的完整性來取代測後的隨批品保抽測,因為一般而言,隨批品保抽測及壞品重測是兩個主耍的無附加價值的作業。
本研究所有的資料均是由實際的生產記錄蒐集而來。透過真實的TEST SPC導入、實際的證驗 其對OEE的影響。
The purpose of this research is about implementation of the SPC concept to fine tune the semi-conductor test operation for chasing the optimum Overall Equipment Efficiency, as well as Overall Equipment Utilization (OEU), then eventually achieve the state of art performance in both of cost & quality.
Parameters mainly considered in this paper include: Overall Equipment Efficiency (OEE), Lot acceptance %, Net Unit Built (NUB),Defect Piece Per Million (DPPM). The essential idea is to control variables like human being discipline, equipment hard ware,test program integrity prior to test to substitute the QA lot acceptance which is performed at right after 100% final test. Capacity consumed for L/A check as well as retest for securing the yiled are believed as the two of major resources of Non Value Added operations.
In this study, data are collected from the real operation informations. Real practices of Test SPC kick-off are demonstrated & assessed to show up the impact to OEE result.
[1] Konopka J., Improving Output in Semiconductor Manufacturing Environment, Ph.D. Dissertation. Arizona Graduate College (1996)
[2] Leachman R., Closed-Loop Measurement of Equipment Efficiency and Equipment Capacity. , IEEE Transaction on Semiconductor Manufacturing, p84-97. (1997)
[3] Nakajima S., “Introduction to TPM”, Total Productive Maintenance Productive Press, Cambridge, M.A. (1988)
[4] Willie Benitez, Deo Marrero, Doug Mirizzi P.E. and Dale Ohmart, Test SPC:A PROCESS TO IMPROVE TEST SYSTEM INTEGRITY,Texas Instruments Application Specific Products-Semiconductor division.
[5] Dale H.Besterfield,Carol Besterfield-Michina,Glen H. Besterfield and Mary Besterfield-Sacre, Total Quality Management,International Edition,.p461~451.
[6] Ames, V. et al., Semiconductor Manufacturing Productivity: Overall EquipmentEffectiveness Guidebook., Revision 1.0. SEMATECH. (1995)
[7] Texas Instruments OEE / OEU training material (2004)
[8] Jose Remond, Test Quality Assuurance, W/W TI Test operation review meeting. (2005)