簡易檢索 / 詳目顯示

研究生: 吳霽耕
JI-GENG WU
論文名稱: 先進規劃排程系統於TFT-LCD彩色濾光片廠之應用
Advanced Planning and Scheduling for TFT-LCD Color Filter Fab
指導教授: 陳建良
James C. Chen
王孔政
Kung-Jeng Wang
口試委員: 吳建瑋
Chien-Wei Wu
學位類別: 碩士
Master
系所名稱: 管理學院 - 工業管理系
Department of Industrial Management
論文出版年: 2013
畢業學年度: 101
語文別: 英文
論文頁數: 36
中文關鍵詞: 排程先進規劃排程彩色濾光片TFT-LCD
外文關鍵詞: scheduling, advanced planning and scheduling, color filter, TFT-LCD
相關次數: 點閱:359下載:4
分享至:
查詢本校圖書館目錄 查詢臺灣博碩士論文知識加值系統 勘誤回報

由於全球化的競爭與利潤的下降,薄膜電晶體液晶顯示器 (Thin Film Transistor - Liquid Crystal Display, TFT-LCD) 產業需透過改善生產效率及降低週期時間以保有本身的競爭力。彩色濾光片 (Color Filter, CF)為TFT-LCD 之關鍵零組件。本研究針對彩色濾光片廠,利用Microsoft Visual Basic for Application (VBA) 建置一套先進規劃排程 Advanced Planning and Scheduling (APS) 系統,自動規劃各產線之生產排程。APS 由五個主要模組所組成,透過訂單優先序模組 (Order Priority Module, OPM)、訂單投料模組 (Lot Release Module, LRM)、產線選擇模組 (Line Selection Module, LSM)、工作負荷堆疊模組 (Workload Accumulation Module, WAM)及工作負荷平衡模組 (Workload Balance Module, WBM) 進行整合性訂單分配與各線投料派工、產能平衡等作業。
實驗結果顯示APS系統可有效降低原人工排程時間同時維持品質水準。其減少逾85%之排程時間並能針對生產不確定性(諸如急單、停機、物料短缺等)作反應,快速得到更新排程結果。生產部人員可使用此APS系統擬定排程並根據系統執行結果做生產判斷。


Intense global competition and declining profit have caused most Thin Film Transistor - Liquid Crystal Display (TFT-LCD) manufacturers to increase their competitiveness by improving productivity and reducing cycle times. Color Filter (CF) is one of the key components of TFT-LCD. In this research, an Advanced Planning and Scheduling (APS) system was developed with Microsoft Visual Basic for Application (VBA) to automatically generate production schedules for color filter fabs. This system can assign orders to production lines, plan order release time, and balance the equipment loading by the implementation of five major modules: order priority module (OPM), lot release module (LRM), line selection module (LSM), workload accumulation module (WAM), and workload balance module (WBM).
Experimental results indicated that APS can significantly reduce manual scheduling time while maintaining the quality of scheduling results. Compared to manual operations, it can save more than 85% of scheduling time and the quickness is especially important when rescheduling is needed due to production uncertainties such as equipment breakdown or material shortage. Production controllers can use this APS to generate initial schedule and make adjustment based on experience.

ACKNOWLEDGMENTS I 摘要 II ABSTRACT III CONTENTS III LIST OF FIGURES IV LIST OF TABLES V Chapter 1 INTRODUCTION 1 1.1 Background and motivation 1 1.2 Research objectives 3 Chapter 2 LITERATURE REVIEW 5 Chapter 3 Methodology 9 3.1 Production constraints for color filter fabrication 9 3.2 Advanced Planning and Scheduling (APS) system 10 3.3 Order Priority Module (OPM) 14 3.4 Lot Release Module (LRM) 15 3.5 Line Selection Module (LSM) 17 3.6 Workload Accumulation Module (WAM) 19 3.7 Workload Balance Module (WBM) 21 Chapter 4 Experiments and Results 26 Chapter 5 Conclusions and Future Research 32 REFERENCES 34

1. Chen, S.H., Chang, C.K. and Kuo, C.L. (2005) Optimal scheduling in color filter manufacturing. J Chin Inst Ind Eng, 22 (4), 301-308.
2. Chen, J.C., Chao, G.C., Sun, C.J., Chao, K.J., Chien, J.W., Chen, C.C., Mo, C.N., Peng, T.W., Wei, Y.Y., Feng, C.H., Liu, Y.C., and Chiang, M.T. (2009) Effective Order Assignment for Color Filter Fabs. SID Symp Dig, 69, 1309-1312.
3. Chen, J.C., Su, L.H., Chen, C.C., Peng, T.W., Chao, G.C. (2011) Release planning for Color Filter Fabs based on iterative simulation. J Soc Inf Disp, 19(7), 480-487.
4. Chen, J.C., Hu, S.J., Huang, P.T.B, Lin, C.J., Chao, K.J. and Chen, C.C. (2010) Finite Capacity Planning for Multiple TFT-LCD Color Filter Fabs. Key Eng Mater, Vols. 419-420, pp 637-640.
5. Wang, F.K., Du, T and Wen, F.C. (2007) Product mix in the TFT-LCD industry. Prod Plan Control, 18 (7), 584-591.
6. Lin, J.T., Wang, F.K. and Peng, C.C. (2008) Lot release times and dispatching rule for a TFT-LCD cell process. Robot Comput-Integr Manuf , 24 (2), 228-238.
7. Chen, W.L., Huang, C.Y. and Lai, Y.C. (2009) Multi-tier and multi-site collaborative production: Illustrated by a case example of TFT-LCD manufacturing. Int J Comput & Ind Eng , 57 (1), 61-72.
8. Lin, J.T., Chen, T.L. and Lin, Y.T. (2009) Critical material planning for TFT-LCD production industry. Int J Prod Econ, 122 (2), 639-655.
9. Pa, P.S. (2012) High-performance micro-electrochemical machining via an optoelectronic irradiation and a graded modular tool. Int J Adv Manuf Technol.
10. Sureshkumar, M.R. and Madhusudanan Pillai V (2012) An efficient method to reduce relative capacity shortage using annualised hours planning. Int J Adv Manuf Technol.
11. Tsai, K.M. and Wang, S.C. (2009) Multi-site available-to –promise modelling for assemble-to-order manufacturing: An illustration on TFT-LCD manufacturing. Int J Prod Econ, 117 (1), 174-184.
12. Park, B.C., Park, E.S., Kim, B.H., Choi, B.K. and Lee, J.H. (2008) Simulation based planning and scheduling system for TFT-LCD fab. Proc 2008 Winter Simul Conf (WSC), 2271-2276.
13. Weigert, G, Klemmt, A and Horn, S (2009) Design and validation of heuristic algorithms for simulation-based scheduling of a semiconductor Backend facility. Int J Prod Res, 47 (8), 2165-2184.
14. Wu, H.H., Chen, C.P., Tsai, C.H. and Yang, C.J. (2010) Simulation and scheduling implementation study of TFT-LCD Cell plants using Drum–Buffer–Rope system. Expert Syst with Appl, 37(12), 8127-8133.
15. Chen, Z.L., Pundoor, G (2006) Order Assignment and Scheduling in a Supply Chain. Oper Res, 54 (3), 555-572.
16. Liu, C.Y. and Chang, S.C. (2000) Scheduling flexible flow shops with sequence-dependent setup effects. IEEE Trans on Robot Autom, 16 (4), 408-419.
17. Allahverdi, A and Soroush, H.M. (2008) The significance of reducing setup times/setup costs. Eur J Oper Res, 187(3), 978-984.
18. Sherali, H.D., Goubergen, D.V. and Landeghem, H.V. (2008) A quantitative approach for scheduling activities to reduce set-up in multiple machine lines. Eur J Oper Res, 187 (3), 1224-1237.
19. Yokoyama, M (2008) Flow-shop scheduling with setup and assembly operations. Eur J Oper Res, 187(3), 1184-1195.
20. Farkas, A, Koltai, T and Stecke, K.E. (1999) Workload Balancing Using the Concept of Operation Types. University of Michigan Business School Working Paper, No. 99-002.
21. Chen, J.C., Chen, C.W., Lin, C.J. and Rau, H (2005) Capacity planning with capability for multiple semiconductor manufacturing fabs. Int J Comput & Ind Eng, 48 (4), 709-732.
22. Toba, H, Izumi, H, Hatada, H and Chikushima, T (2005) Dynamic load balancing among multiple fabrication lines through estimation of minimum inter-operation time. IEEE Trans on Semicond Manuf, 18(1), 202-213.
23. Chen, Y.Y., Chen, T.L. and Liou, C.D. (2012) Medium-term multi-plant capacity planning problems considering auxiliary tools for the semiconductor foundry. Int J Adv Manuf Technol.
24. Ou-Yang, C, Hon, S.J. (2006) Developing an agent-based APS and ERP collaboration framework. Int J Adv Manuf Technol, 35(9-10): 943-967.
25. Lin, J.T., Chen, T.L. and Chen, W.J. (2007) Capacity and product mix planning problem for TFT Array multi-plant. J Chin Inst Ind Eng, 24 (6), 489-504.
26. Lin, J.T., and Chen, Y.Y. (2007) A multi-site supply network planning problem considering variable time buckets– A TFT-LCD industry case. Int J Adv Manuf Technol, 33: 1031–1044.
27. Chen, J.C., Fan, Y.C. and Chen, C.W. (2009) Capacity requirement planning for twin fabs of wafer fabrication. Int J Pro Res, 46 (16), 4473-4496.

無法下載圖示 全文公開日期 2018/01/30 (校內網路)
全文公開日期 本全文未授權公開 (校外網路)
全文公開日期 本全文未授權公開 (國家圖書館:臺灣博碩士論文系統)
QR CODE