簡易檢索 / 詳目顯示

研究生: 謝佳玲
Chia-Ling Hsieh
論文名稱: 建築專案設計流程規劃之研究
Research on Design Process Planning of Building Construction Projects
指導教授: 呂守陞
Sou-Sen Leu
口試委員: 周瑞生
Jui-Sheng Chou
王裕仁
none
學位類別: 碩士
Master
系所名稱: 工程學院 - 營建工程系
Department of Civil and Construction Engineering
論文出版年: 2009
畢業學年度: 97
語文別: 中文
論文頁數: 129
中文關鍵詞: 設計結構矩陣撕裂熵值權重法
外文關鍵詞: Tearing, Design structure matrix (DSM), Entropy weight method
相關次數: 點閱:290下載:4
分享至:
查詢本校圖書館目錄 查詢臺灣博碩士論文知識加值系統 勘誤回報

設計流程係由為數龐大以及關係複雜之作業所組成,在執行過程中,不同領域的設計工程師常常需要相互與反覆地交換訊息與意見才得以完成。建立合宜的設計流程與溝通機制,除可有效提昇設計專案之效率外,亦可有效提升設計專案之品質,提升客戶滿意度。
本研究將著重於設計活動間訊息傳遞之排程最佳化與改善,並建立與驗證排程系統分析與其模組。透過文獻回顧,了解設計結構矩陣之理論與邏輯,利用關聯性之敏感因子及變動因子以專家調查及熵值權重法客觀地評估“tears",以解決耦合區塊所造成之資訊複雜情形。透過實際案例分析,整合出解決耦合區塊群組之方法,並建立其“tears"之管理策略。


A design process includes a large number of complex operations. In the process, the design engineers in different fields often need to exchange information and opinions to each other repeatedly to complete the design. Establishing appropriate design process and communication mechanism can effectively promote the efficiency of design project and improve the quality of design project and customer satisfaction.
This study focuses on optimizing and improving the scheduling of the messages between design activity as well as establishing and verifying scheduling system analysis and modules. Through the literature review to understand the theory and the logic of design structure matrix (DSM); Using the relationship of sensitivity and variability in factor through expert investigation and entropy weight method objectively evaluate "tears" to solve the complexity of the information resulted from the coupling block. Through the analysis of actual cases to integrate the solution of the coupling block groups and establish “tears"of the management strategy.

目錄 摘要 I ABSTRACT II 誌謝 III 目錄 IV 圖目錄 VII 表目錄 IX 第一章 緒論 1 1.1 研究動機與目的 3 1.2 研究範圍與內容 4 1.3 研究方法與步驟 6 第二章 文獻回顧 11 2.1 設計流程排序之工具 11 2.2 設計結構矩陣 12 2.2.1 設計結構矩陣性質與優勢 12 2.2.2 DSM應用之相關文獻探討 16 2.3 作業關聯性相關文獻探討 19 2.4 熵理論相關文獻探討 22 2.5 結語 23 第三章 研究方法之探討與應用 25 3.1 傳統建築設計流程探討 25 3.1.1 建築工程設計流程之概述及應用領域 25 3.1.2 建築工程設計流程之整合方式探討 27 3.1.3 小結 29 3.2 設計結構矩陣方法 30 3.2.1 設計流程與資料傳遞之類型 31 3.2.2 設計結構矩陣方法之選擇 33 3.2.3 DSM分析之演算法 34 3.2.4 設計結構矩陣之應用步驟 35 3.3 作業關聯性量化 39 3.4 熵理論—熵值權重法 41 3.5 結語 46 第四章 設計流程規劃模式建立 47 4.1 專案流程架構概念之確立 47 4.2 建立分析流程 48 4.2.1 建築設計活動之定義及蒐集 49 4.2.2 作業間訊息傳遞關係分析彙整 51 4.2.3 作業間訊息傳遞關係輸入DSM矩陣 52 4.2.4 進行DSM分割 53 4.2.5 判斷耦合群組形式 54 4.2.6 耦合區塊作業間關聯強度 55 4.2.7 矩陣撕裂與重組 57 4.2.8 分析模組評估 59 第五章 建築設計案例整合分析 61 5.1 各階段設計作業項目調查 61 5.2 作業活動間資訊傳遞關係整理 64 5.3 輸入DSM分析與判斷耦合群組形式 64 5.4 耦合群組分解 69 5.4.1 作業間關聯強度調查與分析 69 5.4.2 矩陣撕裂與重組 90 5.4.3 分析模組評估 93 第六章 結論與建議 97 6.1 結論 97 6.2 建議 98 參考文獻 101 附錄A DSM作業活動訊息傳遞填寫問卷 107 附錄B 建築設計前置與後置作業間之關聯性問卷調查表 110

參考文獻
1. Tyson R. Browning, "Applying the design structure matrix to system decomposition and integration problems: A review and new direction," IEEE transactions on engineering management, Vol. 48, No. 3, pp. 292-306, (2001).
2. Thomas A. Roemer and Steven Eppinger, "Tools For Innovation: The Design Structure Matrix ",Summer 02 15-761,(2002).
3. Thomas A. Roemer, "Managing Product Development Processcs", The Sloan School of Management Massachusetts Institute of Technology.
4. Ali Yassine, and Dan Braha ," Complex Concurrent Engineering and the Design Structure Matrix Method ", Center for Technology, Policy and Industrial Development (CTPID) , Center for Innovation in Product Development (CIPD), Massachusetts Institute of Technology, Cambridge, MA 02139, USA.
5. Ali A. Yassine, "An Introduction to Modeling and Analyzing Complex Product Development Processes Using the Design Structure Matrix (DSM) Method". ,Quaderni di Management (Italian Management Review),No.9,(2004).
6. Paul Waskett, John Newton and Andrew Steele, "Implementing DSM in a large fragmented engineering project team".the 7th International Dependency Structure Matrix (DSM) Conference October 4-6, (2005).Seattle, Washington, USA.
7. Tyson R. Browning ,"Using the Design Structure Matrix (DSM) for Process Integration",(2000).
8. Baldwin, A.N., Austin, S.A.A. Shen, L.Y., Poon, C.S. & Wong I. "DSM Application In Repetitive High-rise Building Construction". the 7th International Dependency Structure Matrix (DSM) Conference,(2005).
9. Travis P. Dunn and Joseph M. Sussman, "Using Design Structure Matrices to Improve Decentralized Urban Transportation Systems ",(2005).
10. H. Weinblatt, “A new search algorithm for finding the simple cycles of finite directed graphs”, Journal of ACM, 19, pp.43-56, 1972.
11. Donald V. Steward, Systems Analysis and Management: Structure, Strategy and Design,Petrocelli Books, New York, (1981).
12. A. Kusiak, and J. Wang, “Efficient organizing of design activities”, International Journal of Production Research, 31, pp.753-769, 1993.
13. Ali Yassine, Donald R. Falkenburg and Ken Chelst, ”Engineering Design Management: An Information Structure Approach”, International Journal of Production Research,Vol.37, No.13, pp.2957-2975, (1999).
14. Thomas U. Pimmler and Steven D. Eppinger, “Integration analysis of product decompositions”, Massachusetts Institute of Technology Cambridge, Massachusetts, (1994).
15. Nader Sabbaghian and Steven Eppinger, “Product development process capture and display using Web-Based technologies”, Massachusetts Institute of Technology Cambridge, Massachusetts, (1998).

中文參考文獻
16. 鄭明淵,「建築設計施工電腦圖檔管理之研究」,國立台灣科技大學研究計劃,(2000)。
17. 施宣光,「建築設計專案組織溝通與知識創造」,國立台灣科技大學建築系碩士論文,(2002)。
18. 余仁彬,「建築設計階段專業分工之介面整合研究 – 以設備系統與建築介面之整合為例」,國立臺北科技大學建築與都市設計研究所碩士論文,(2004)。
19. 陳俊伊,「同步工程應用於新產品開發專案工作協調之研究」,國立台北科技大學生產系統工程與管理研究所碩士論文,(2002)。
20. 張東民、廖文和、羅衍領,「基於設計結構矩陣的設計過程建模研究」,應用科學學報第22卷第4期,(2004)。
21. 吳建南,「TRIZ與模組化之設計結構矩陣在產品開發之研究」,私立東海大學工業設計研究所碩士論文,(2006)。
22. 曾健鴻,「矩陣邏輯運用在設計作業之研究」,國立台灣科技大學營建工程系碩士論文,(2008)。
23. 洪家森,「應用設計結構矩陣與設計準則建構全球產品開發流程」,國立中央大學工業管理研究所碩士論文,(2008)。
24. 田志強,「設計作業時間規劃」,國立成功大學土木工程研究所碩士論文,(2001)。
25. 張志光,「應用設計架構矩陣分析協同設計流程之研究」,國立成功大學工業與資訊管理學系,(2005)。
26. 郭明祥,「高科技廠房統包工程之執行面缺失與設計作業間關聯性之探討」,國立交通大學土木工程系所碩士論文,(2005)。
27. 郭奉宜,「統包工程之進度規劃模式」,國立交通大學土木工程學系碩士論文,(2005)。
28. 王思琳,「從資訊流建立規劃設計作業程序最佳化之模式」,國立成功大學土木工程系碩士論文,(2005)。
29. 郭奕玲、沈慧君,「物理通史」,(凡異出版社),p.109,(1994)。
30. 胡谷展,「台北市酒後駕車執法策略與績效之研究」,國立交通大學交通運輸研究所碩士論文,(2002)。
31. 張淑青,「熵在多角化衡量的應用」,中興大學企業管理學報,第42 期,pp.1-26,(1998)。
32. 李羽彬,「熵-信息理論與系統工程方法論的有效性分析」,系統工程理論與實踐,第14卷,第2 期,pp 37-42, (1994)。
33. 閻植林、邱菀華、陳志強,「管理系統有序度評價的熵模型」,管理系統有序度評價的熵模型,第17卷,第6 期,pp 45-48, (1997)。

34. 王宜婷,「新產品開發流程動態模型之建構」,國立成功大學企業管理學系研究所碩士論文,(1998)。
35. 王鴻鈞,「以熵最佳化觀念建構新產品開發工作小組之研究」,國立成功大學工業管理所碩士論文,,(2000)。
36. 蔡奈蓉,「西班牙觀光競爭力之研究」,南華大學歐洲研究所碩士論文,(2001)。
37. 蘇永裕,「應用熵權重法與灰色理論於產品設計之硏究」,國立成功大學工業設計研究所碩士論文,(2004)。
38. 黃鈵淞,「建築工程系統整合評估架構之研究」,國立台灣科技大學營建工程系碩士論文,(2006)。
參考網站
http://www.dsmweb.org/

QR CODE