研究生: |
何平華 Nelly |
---|---|
論文名稱: |
Exploring the Influence of Project Management Knowledge on Construction Project Success: A Cross Country Study Exploring the Influence of Project Management Knowledge on Construction Project Success: A Cross Country Study |
指導教授: |
周瑞生
Jui-Sheng Chou |
口試委員: |
呂守陞
Sou-Sen Leu 曾惠斌 Hui-Ping Tserng 陳柏翰 Po-Han Chen |
學位類別: |
碩士 Master |
系所名稱: |
工程學院 - 營建工程系 Department of Civil and Construction Engineering |
論文出版年: | 2013 |
畢業學年度: | 101 |
語文別: | 英文 |
論文頁數: | 147 |
中文關鍵詞: | Construction industry 、PMBOK 、project success index 、importance-performance analysis 、cross-country comparison 、structural equation modeling. |
外文關鍵詞: | Construction industry, PMBOK, project success index, importance-performance analysis, cross-country comparison, structural equation modeling. |
相關次數: | 點閱:274 下載:4 |
分享至: |
查詢本校圖書館目錄 查詢臺灣博碩士論文知識加值系統 勘誤回報 |
Despite the fact that many studies have investigated factors that affect project success, relatively few have specifically explored the effects of PMBOK (Project Management Body of Knowledge) Guide. The contribution of PMBOK to project success was studied to disclose cross-country similarities and differences by conducting a multinational investigation. A questionnaire survey of professional engineers in the construction industry (project managers, stakeholders, and team members) was performed in Taiwan, Indonesia and Vietnam. Structural equation modeling (SEM) was used to test the relationship between PMBOK techniques/tools/skills (TTS) and project success. In this study, the Project Success Index (PSI), which adapts the frameworks of the American Customer Satisfaction Index (ACSI), and importance-performance analysis (IPA) are also presented to evaluate the project success. The proposed novel PSI framework along with the IPA can help construction practitioners to implement effective managerial strategy, improve project performance, and improve efficiency in the use of management resources thus enhance project success. The empirical study showed that effective application of PMBOK TTS can enhance project success. Moreover, construction practitioner can develop marketing strategies to improve project success based on the importance and perceived performance in each quadrant of IPA.
Despite the fact that many studies have investigated factors that affect project success, relatively few have specifically explored the effects of PMBOK (Project Management Body of Knowledge) Guide. The contribution of PMBOK to project success was studied to disclose cross-country similarities and differences by conducting a multinational investigation. A questionnaire survey of professional engineers in the construction industry (project managers, stakeholders, and team members) was performed in Taiwan, Indonesia and Vietnam. Structural equation modeling (SEM) was used to test the relationship between PMBOK techniques/tools/skills (TTS) and project success. In this study, the Project Success Index (PSI), which adapts the frameworks of the American Customer Satisfaction Index (ACSI), and importance-performance analysis (IPA) are also presented to evaluate the project success. The proposed novel PSI framework along with the IPA can help construction practitioners to implement effective managerial strategy, improve project performance, and improve efficiency in the use of management resources thus enhance project success. The empirical study showed that effective application of PMBOK TTS can enhance project success. Moreover, construction practitioner can develop marketing strategies to improve project success based on the importance and perceived performance in each quadrant of IPA.
Belout, A., and Gauvreau, C. (2004). "Factors influencing project success: the impact of human resource management." International Journal of Project Management, 22(1), 1-11.
Dvir, D., Raz, T., and Shenhar, A. J. (2003). "An empirical analysis of the relationship between project planning and project success." International Journal of Project Management, 21(2), 89-95.
Griffith, A. F., Gibson, G. E., Hamilton, M. R., Tortora, A. L., and Wilson, C. T. (1999). "Project Success Index for Capital Facility Construction Projects." Journal of Performance of Constructed Facilities, 13(1), 39-45.
Milosevic, D., and Patanakul, P. (2005). "Standardized project management may increase development projects success." International Journal of Project Management, 23(3), 181-192.
Doloi, H., Iyer, K. C., and Sawhney, A. (2011). "Structural equation model for assessing impacts of contractor's performance on project success." International Journal of Project Management, 29(6), 687-695.
Cho, K., Hong, T., and Hyun, C. (2009). "Effect of project characteristics on project performance in construction projects based on structural equation model." Expert Systems with Applications, 36(7), 10461-10470.
de Wit, A. (1988). "Measurement of project success." International Journal of Project Management, 6(3), 164-170.
Papke-Shields, K. E., Beise, C., and Quan, J. (2010). "Do project managers practice what they preach, and does it matter to project success?" International Journal of Project Management, 28(7), 650-662.
Hyvari, I. (2006). "Project management effectiveness in project-oriented business organizations." International Journal of Project Management, 24(3), 216-225.
PMI (2008). A Guide to the Project Management Body of Knowledge (PMBOKR Guide) - Fourth Edition, Project Management Institute, Inc., Pennsylvania, USA.
Chou, R. (2010). <http://blogs.pmi.org/blog/voices_on_project_management/2010/03/changing-taiwans-project-manag.html>.
Bay, A. F., Susilawati, C., and Skitmore, M. (2005). Tingkat Kematangan Manajemen Proyek: Survei di Beberapa Tempatt di Indonesia.
Ho, C., Nguyen, P. M., and Shu, M. H. (2007). "Supplier Evaluation and Selection Criteria in the Construction Industry of Taiwan and Vietnam." Information and Management Science, 18(4), 403-426.
Fornell, C., Johnson, M. D., Anderson, E. W., Cha, J., and Bryant, B. E. (1996). "The American Customer Satisfaction Index: Nature, Purpose, and Findings." Journal of Marketing, 60(4), 7-18.
Ling, F. Y. Y., Low, S. P., Wang, S., and Egbelakin, T. (2008). "Models for Predicting Project Performance in China Using Project Management Practices Adopted by Foreign AEC Firms." Journal of Construction Engineering and Management, 134(12), 983-990.
Munns, A. K., and Bjeirmi, B. F. (1996). "The role of project management in achieving project success." International Journal of Project Management, 14(2), 81-87.
Schwalbe, K. (2005). Information Technology Project Management, Course Technology.
Alhir, S. S. (2003). "Understanding the Project Management Body of Knowledge Guide." Methods&Tools, Martinig& Associates, Switzerland.
Alzahrani, J. I., and Emsley, M. W. (2013). "The impact of contractors’ attributes on construction project success: A post construction evaluation." International Journal of Project Management, 31(2), 313-322.
Budisuanda (2011). "Project Success Factors." <http://manajemenproyekindonesia.com/?p=714>. (2011).
Muller, R., Geraldi, J., and Turner, J. R. (2011). "Relationships Between Leadership and Success in Different Types of Project Complexities." Engineering Management, IEEE Transactions on Engineering Management 59(1), 77-90.
Kerzner, H. (2009). PROJECT MANAGEMENT A Systems Approach to Planning, Scheduling, and Controlling, John Wiley & Sons, Inc, New Jersey.
Molenaar, K., Washington, S., and Diekmann, J. (2000). "Structural Equation Model of Construction Contract Dispute Potential." Journal of Construction Engineering and Management 126(4), 268-277.
Angela, C. (1999). "A practical use of key success factors to improve the effectiveness of project management." International Journal of Project Management, 17(3), 139-145.
Konchar, and Sanvido (1998). "Comparison of U.S. Project Delivery Systems." Journal of Construction Engineering and Management, 124(6), 435-444.
Chan, E., and Chan, A. (2000). "Imposing ISO 9000 Quality Assurance System on Statutory Agents in Hong Kong." Journal of Construction Engineering and Management, 125(4), 285-291.
Ling, F., Chan, S., Chong, E., and Ee, L. (2004). "Predicting Performance of Design-Build and Design-Bid-Build Projects." Journal of Construction Engineering and Management, 130(1), 75-83.
Scott-Young, C., and Samson, D. (2008). "Project success and project team management: Evidence from capital projects in the process industries." Journal of Operations Management, 26(6), 749-766.
Zwikael, O., Shimizu, K., and Globerson, S. (2005). "Cultural differences in project management capabilities: A field study." International Journal of Project Management, 23(6), 454-462.
Chou, J.-S., and Yang, J.-G. (2012). "Project Management Knowledge and Effects on Construction Project Outcomes: An Empirical Study." Project Management Journal, 43(5), 47-67.
MacCallum, R. C., Widaman, K. F., Zhang, S., and Hong, S. (1999). "Sample Size in Factor Analysis." Psychological Methods, 4(1), 84-99.
Hatcher, L. (1994). A Step-By-Step Approach to Using the Sas System for Factor Analysis and Structural Equation Modeling, SAS Inst.
Garson, G. D. (2012). "Factor Analysis." Statistical Associates Publishers North Carolina.
Comrey, A. L., and Lee, H. B. (1992). A First Course Factor Analysis, Taylor & Francis Group.
Guadagnoli, E., and Velicer, W. F. (1988). "Relation of sample size to the stability of component patterns." Psychological Bulletin, 103, 265-275.
McLeod, S. A. (2008). "Likert Scale." <http://www.simplypsychology.org/likert-scale.html>.
M.Byrne, B. (2009). Structural Equation Modeling with AMOS: Basic Concepts, Applications, and Programming, Taylor & Francis Inc, New York.
Chou, J.-S., and Kim, C. (2009). "A structural equation analysis of the QSL relationship with passenger riding experience on high speed rail: An empirical study of Taiwan and Korea." Expert Systems with Applications, 36(3, Part 2), 6945-6955.
Hair, J. F., Black, W. C., Babin, B. J., and Anderson, R. E. (2010). Multivariate Data Analysis: A global perspective (Seventh Edition), Pearson Education International, New Jersey.
B.Kline, R. (2011). Priciples and Practice of Structural Equation Modeling (Third Edition), The Guilford Press, New York.
A.Hayduk, L. (1987). Structural Equation Modeling with LISREL, the Johns Hopkins University Press.
Bollen, K. A. (1989). "A New Incremental Fit Index for General Structural Equation Models." Sociological Methods and Research, 17(3), 303-316.
Fornell, C., and F.Larcker, D. (1981). "Evaluating Structural Equation Models with Unobservable Variables and Measurement Error." Journal of Marketing Research, 18(1), 39-50.
Anderson, J. C., and Gerbing, D. W. (1988). "Structural Equatin Modeling in Practice: A Review and Recommend Two-Step Approach." Psychological Bulletin, 103(3), 411-423.
Chou, J.-S., Kim, C., Kuo, Y.-C., and Ou, N.-C. (2011). "Deploying effective service strategy in the operations stage of high-speed rail." Transportation Research Part E: Logistics and Transportation Review, 47(4), 507-519.
Abalo, J., Varela, J., and Manzano, V. (2007). "Importance values for Importance–Performance Analysis: A formula for spreading out values derived from preference rankings." Journal of Business Research, 60(2), 115-121.
Geng, X., and Chu, X. (2012). "A new importance–performance analysis approach for customer satisfaction evaluation supporting PSS design." Expert Systems with Applications, 39(1), 1492-1502.
Eskildsen, J. K., and Kristensen, K. (2006). "Enhancing Importance-performance Analysis." International Journal of Productivity and Performance Management, 55 No.1(2006), 40-60.
Ford, J. B., Joseph, M., and Joseph, B. (1999). "Importance-performance analysis as a strategic tool for service marketers: the case of service quality perceptions of business students in New Zealand and the USA." Journal of Service Marketing, 13(2), 171-186.
Schwab, K. (2012). "The Global Competitiveness Report 2012 - 2013: Full Data Edition." World Economic Forum, Geneva.
Kaming, P. F., Olomolaiye, P. O., Holt, G. D., and Harris, F. C. (1997). "Factors influencing construction time and cost overruns on high-rise projects in Indonesia." Construction Management and Economics, 15(1), 83-94.
PMI (2007). Construction Extension to A Guide to the Project Management Body of Knowledge (PMBOKR Guide-Third Edition), Project Management Institute, Inc. , Pennsylvania, USA.