簡易檢索 / 詳目顯示

研究生: 蔡穎杰
Ying-Chieh Tsai
論文名稱: 從篳路藍縷到遍地開花的都更之路 –探討永和大陳都更2 單元的演進
From hardships of rough roads to urban renewal roads full of flowers – The case study of Yonghe Da Chen urban renewal No.2
指導教授: 梁瓊如
Chiung-Ju Liang
口試委員: 王孔政
Kung-Jeng Wang
彭雲宏
Yeng-Horng Perng
學位類別: 碩士
Master
系所名稱: 管理學院 - 管理研究所
Graduate Institute of Management
論文出版年: 2023
畢業學年度: 111
語文別: 中文
論文頁數: 40
中文關鍵詞: 公辦都更大陳人都市更新防災型都更勝開大地新北市政府都發局永和區房價新北市住都中心
外文關鍵詞: Public-led urban renewal, Dachen residents, urban renewal, Disaster prevention-type urban renewal, Sheng-Kai Development Institution, New Taipei City Government Housing and Urban Development Bureau, Yonghe housing prices, New Taipei City Housing and Urban Regeneration Center
相關次數: 點閱:174下載:0
分享至:
查詢本校圖書館目錄 查詢臺灣博碩士論文知識加值系統 勘誤回報

本文描述了國民政府撤退後,安排浙江外海的大陳島居民,由美國第七艦隊
護送撤退到台灣後,政府安置於在十二個縣市,建立了三十五個大陳新村供居住。
其中永和五和新村在1959 年的八七水災中,造成大陳居民失去家園,政府徵收
了新生地作為安置區。隨著時間推移和人口增加,五和新村成為全省最大的大陳
聚落,但土地和建物權屬關係複雜,違章增建狀況嚴重。在都市更新條例通過後,
永和大陳地區的都市更新開始規劃,由於土地權屬複雜,因此提出以公部門主導,
整合公私有土地,推動公辦都市更新案,以促成大陳社區的都市更新。但大陳都
更計畫首次公告招商,在舉辦招商說明會後,沒有任何一家廠商投標。市府隨後
降低申請門檻,重新組織招商,希望能帶動整個區域的都更計畫。最終,只有第
2 單元由當地建商勝治機構得標,該公司以永和為榮,並表示願意挑戰高難度的
都更計畫,希望能改變永和的地貌和城市景觀。
在都更整合過程中,因產權複雜、土地使用問題等原因,使得都更案相當複
雜。政府和開發商需要解決眾多產權問題和土地使用問題,社區居民也希望能夠
成功推動都更計畫。建設公司將建案規劃三棟大廈,建案特色為豐富的公共設施、
銀級綠建築設計,並採用SRC 鋼骨結構,結構安全可靠。但就在大陳2 單元成
功整合完畢時,房地合一稅制導致房地產市場急凍。此時即將公開銷售的第2 單
元面臨挑戰,因此銷售公司擬定拉長戰線的行銷策略,最終在建案完工落成沒多
久,就順利達到完銷的成績。而成為永和市首個完成的公辦都更案,具有示範性
和公益性,立下典範吸引了更多的建商關注和參與,成功帶動其他單元陸續招商
成功。在新北住都中心成立後,更加速了都更計畫的進行,透過全新的招商模式,
與直接的諮詢管道,提高住戶的參與度和信任度,促進都更計畫的順利進行。


This article describes that after the national government retreated, it arranged for
the residents of Dachen Island off the coast of Zhejiang to retreat to Taiwan under theescort of the U.S. Seventh Fleet.
Among them, Yonghe Wuhe New Village suffered from the August 7th flood in
1959, causing the residents of Dachen to lose their homes. The government
expropriated the new land as a resettlement area. With the passage of time and
population increase, Wuhe New Village has become the largest Dachen settlement in
the province, but the relationship between land and building ownership is complicated,and the situation of illegal additions is serious.
After the adoption of the Urban Renewal Regulations, the urban renewal of the
Yonghe and Dachen areas began to be planned. Due to the complexity of land
ownership, it was proposed that the public sector should take the lead, integrate public and private land, and promote public urban renewal projects to promote the urban renewal of the Dachen community.
However, Da Chen urban renewal to announce the investment invitation for the
first time. After holding the investment promotion briefing, no manufacturer bid. The
city government then lowered the application threshold and reorganized investment
promotion, hoping to drive the reform of the entire region.
In the end, only the second unit was tender by the local construction company
Shengzhi Organization. The company is proud of Yonghe and expressed its willingness
to challenge the difficult urban renewal project, hoping to change the landform and
urban landscape of Yonghe.
In the process of urban renewal integration, due to complex property rights, land
use issues and other reasons, urban renewal projects are quite complicated.
The government and developers need to resolve many property rights issues and
land use issues, and community residents also hope to successfully promote the urban
renewal plan.
The construction company plans to build three buildings. The construction features
are rich public facilities, silver-level green building design, and SRC steel frame
structure, which is safe and reliable.
But just when Dachen Unit 2 was successfully integrated, the real estate market
was frozen due to House and Land Transactions Income Tax of real estate.
At this time, the second unit, which was about to be sold to the public, was facing
challenges, so the sales company formulated a marketing strategy to extend the front
line, and finally reached the completion of the sale not long after the completion of the construction project.
And it became the first government-led urban renewal project completed in
Yonghe City. It is exemplary and public welfare. It has set an example and attracted
more attention and participation of construction companies, and successfully drove
other units to succeed in attracting investment.
After the establishment of the New Taipei City Housing and Urban Regeneration
Center, the progress of the Metropolitan Project has been accelerated. Through the
brand-new investment promotion model and direct consultation channels, the
participation and trust of residents have been improved, and the smooth progress of the Metropolitan Project has been promoted.

摘要 I Abstract II 誌謝 III 目錄 IV 圖目錄 V 表目錄 VI 壹、個案本文 1 一、美軍協助 撤退來台 1 二、大陳島民 安置工作 2 三、大陳新村 房屋分配 4 四、八七水災 移至現址 5 五、房屋增建 違章嚴重 6 六、都更條例 通過上路 7 七、永和人口 增長演變 8 八、縣府推動 大陳都更 10 九、大陳都更 規劃藍圖 11 十、乏人問津 出手相挺 14 十一、都更事件 處處受阻 15 十二、建築規畫 分回條件 17 十三、整合四年 達百分百 19 十四、房地合一 重挫房市 21 十五、逆境銷售 衝出重圍 22 十六、立下典範 陸續標出 25 十七、住都中心 加速都更 28 貳、教學指引 30 一、個案教學總覽 30 二、教學目標適用課程 31 三、教學目標探討 32 四、課程結論 39 參、參考文獻 40 中文文獻 40 英文文獻 40

中文文獻
CSR Times(2019),「共創價值系統 Chapter 1:如何區分 CSR 與 SCV?」,《CSR Times 2019.07.17》CSR Times,香港
MBA 智庫.百科,「資源基礎理論」
何政哲(2005),「大陳過台灣-1950年代新移民的個案研究」《淡江大學歷史學系碩士班論文》
林和謙(2023),「永和大陳1、4單元都更意願破9成!最快第3季與出資人簽約」《好房網2023/02/22》,新北
新北市政府都市更新處(2020),「永和大陳公辦都更歡慶入住 永平市民活動中心同步啟用」《財團法人都市更新研究發展基金會2020/10/20》,新北
新北市政府都市更新處(2020),「家的價值再定義:從他鄉到故鄉的歷程」《新北市政府都市更新處2020/12》,新北
英文文獻
Michael E. Porte, Mark R. Kramer (2011),Creating Shared Value, Harvard Business Review.
Vargo and Lusch(2004),The Service-Dominant Mindset,University of Arizona、University of Hawaii

無法下載圖示 全文公開日期 2033/05/29 (校內網路)
全文公開日期 本全文未授權公開 (校外網路)
全文公開日期 2033/05/29 (國家圖書館:臺灣博碩士論文系統)
QR CODE